We use SAP IS-RETAIL.
I'm probably not properly raised the question, I will try to describe the scenario in more detail.
On the script component is in stock in 2000
In the setting of material master data warehouse is not installed
when you convert a planned order into a production order, the system checks only available in stock in 2100, and I need the system to be verified in the same storage 2000
How to configure the system to check the availability of stock and production for 2100 and 2000 in a warehouse, warehouse storage?